This stage focused on stripping the existing room back so the rebuild could be carried out properly. The original arrangement had to be opened up, with panel edges, openings and trim details exposed so the new room lines could be formed accurately.
Good preparation work matters because a rebuild is only as strong as the starting point. Cleaning back the structure and exposing the true working edges helps avoid carrying old layout problems into the new room.


Need help with a real job?
If you are reading this because you need advice on a live installation, repair or maintenance issue, get in touch directly.
See our service routes
Use the services section to compare air conditioning, refrigeration, plumbing, property services and maintenance support.
Browse related products
The shop includes refrigeration product groups if you need to compare equipment before deciding on the next step.