Category: Projects

  • Cold Room Strip-Out & Rebuild Preparation

    This stage focused on opening up and preparing an existing temperature-controlled room arrangement for a more practical rebuild. Strip-out and preparation work often decides how cleanly the next phase can move forward, so getting access, structure and layout right early matters.

    Cold room strip out and rebuild preparation

  • Cold Room Door, Frame & Room Finish Upgrade

    Door, frame and room-finish details can have a big impact on usability, reliability and the overall impression a room leaves. This work focused on getting access points and finish quality moving in the right direction as part of a wider improvement job.

    Cold room door and frame upgrade works

    Cold room frame and room finish improvements

  • Freezer Room Envelope Repair & Finish Upgrade

    This project entry reflects repair-led work aimed at improving the room envelope and finish so the space is better prepared for reliable ongoing use. Jobs like this often sit between reactive repair and full rebuild work, giving the customer a more practical route forward.

    Freezer room envelope repair and finish upgrade

    Freezer room door and finish upgrade

  • Cold Room Extension & New Freezer Room Build

    Project overview

    This project involved improving an existing temperature-controlled setup by extending one room and building a second adjoining room so the final arrangement could support separate cold room and freezer room use. The work shown in the photo set includes strip-out, opening preparation, room division, door-frame progress and the move toward a cleaner finished layout.

    What was needed

    The existing arrangement no longer suited the way the space needed to operate. The goal was not simply to patch the old room but to create a more useful layout that could support two different temperature-controlled functions side by side.

    What the work involved

    Cold room extension and freezer room build in progress

    Why projects like this matter

    Cold room and freezer room work is often about getting the layout right as much as the equipment. A better room arrangement can make access easier, improve separation between chilled and frozen storage, and create a more dependable long-term setup for the customer.

    Completed two room temperature controlled arrangement

  • Cold Room Strip-Out & Rebuild Preparation

    This stage focused on stripping the existing room back so the rebuild could be carried out properly. The original arrangement had to be opened up, with panel edges, openings and trim details exposed so the new room lines could be formed accurately.

    Good preparation work matters because a rebuild is only as strong as the starting point. Cleaning back the structure and exposing the true working edges helps avoid carrying old layout problems into the new room.

    Cold room strip out and rebuild preparation

    Cold room preparation before rebuild

  • Two-Room Temperature-Controlled Layout Upgrade

    This project stage shows the move toward a more useful two-room arrangement. Instead of relying on one compromised space, the site gains a clearer layout that can support separate cold room and freezer room functions more effectively.

    Two room temperature controlled layout during works

  • Cold Room Door & Frame Replacement Works

    As part of the wider room works, door and frame details also needed attention. Access points are critical in temperature-controlled rooms because poor alignment, damaged finishes or awkward openings quickly affect how the site uses the room in practice.

    This part of the job focused on creating cleaner, more dependable access around the rebuilt room layout.

    Cold room door and frame replacement works

    Cold room access point and frame details

  • Freezer Room Envelope Repair & Finish Upgrade

    Once structural changes and opening adjustments are made, the room still needs to be brought back to a reliable finished state. This project entry focuses on the freezer-room side of the works, where repairs and finishing details were part of getting the room ready for practical use again.

    Finishing work is often what separates a temporary-looking alteration from a room that feels properly rebuilt and ready for service.

    Freezer room envelope repair and finish upgrade

    Completed freezer room access and finish details

  • Temperature-Controlled Back-of-House Improvement Works

    These finishing-stage images show the room arrangement in a cleaner, more useable form. Improvement work of this kind helps move a site from a tired or compromised setup toward something that looks more controlled, works more practically and is easier to maintain.

    Temperature controlled back of house improvement works

    Completed room arrangement after improvement works