Blog

  • Cold Room Door & Frame Replacement Works

    As part of the wider room works, door and frame details also needed attention. Access points are critical in temperature-controlled rooms because poor alignment, damaged finishes or awkward openings quickly affect how the site uses the room in practice.

    This part of the job focused on creating cleaner, more dependable access around the rebuilt room layout.

    Cold room door and frame replacement works

    Cold room access point and frame details

  • Two-Room Temperature-Controlled Layout Upgrade

    This project stage shows the move toward a more useful two-room arrangement. Instead of relying on one compromised space, the site gains a clearer layout that can support separate cold room and freezer room functions more effectively.

    Two room temperature controlled layout during works

  • Cold Room Strip-Out & Rebuild Preparation

    This stage focused on stripping the existing room back so the rebuild could be carried out properly. The original arrangement had to be opened up, with panel edges, openings and trim details exposed so the new room lines could be formed accurately.

    Good preparation work matters because a rebuild is only as strong as the starting point. Cleaning back the structure and exposing the true working edges helps avoid carrying old layout problems into the new room.

    Cold room strip out and rebuild preparation

    Cold room preparation before rebuild

  • Cold Room Extension & New Freezer Room Build

    Project overview

    This project involved improving an existing temperature-controlled setup by extending one room and building a second adjoining room so the final arrangement could support separate cold room and freezer room use. The work shown in the photo set includes strip-out, opening preparation, room division, door-frame progress and the move toward a cleaner finished layout.

    What was needed

    The existing arrangement no longer suited the way the space needed to operate. The goal was not simply to patch the old room but to create a more useful layout that could support two different temperature-controlled functions side by side.

    What the work involved

    Cold room extension and freezer room build in progress

    Why projects like this matter

    Cold room and freezer room work is often about getting the layout right as much as the equipment. A better room arrangement can make access easier, improve separation between chilled and frozen storage, and create a more dependable long-term setup for the customer.

    Completed two room temperature controlled arrangement